RMD/Market Basket Showcase
TEC works very closely with RMD, Inc. and Market Basket to ensure that their projects are successful at every stage of the process. The projects below are a representation of the growth and development this partnership is generating.
Project Details |
Status |
|
|
Store #3, Wilmington, MAThis project is a redevelopment of an existing retail mall that consists of expanding the current Market Basket Supermarket and retail plaza while maintaining full use of the existing plaza. Services: Site Design/Redevelopment, Wetland Constraints, Low-Impact Stormwater Systems, Construction Phasing, Permitting Through Planning Board and Conservation Commission, MassHighway Access Permitting. |
Construction Starting November 2007 |
|
Store #14, Fitchburg, MAAs owners of an entire retail plaza, Market Basket relocated from one anchor to another, expanding the Supermarket space. Permitting and civil engineering was required for the transition. Services: Site Design/Redevelopment, Drainage System, Construction Inspection, Permitting Through Town Planning Board and Conservation Commission, Offsite Front-Door Improvements. |
Construction Completed October 2007 |
|
Store #17, Gloucester, MARMD is planning to develop a currently vacant site in Gloucester to build a new Supermarket. The current zoning does not allow this use by right. RMD will have to go through a rezoning process, and is also planning to contribute to the extension of the city's sewer lines on the local roads adjacent to the site. Services: Site Design/New Development, Wetlands Constraints, Rezoning Process Through City Council, Proposed Sewer Line on Concord Street, Roadway Improvements, Drainage System. |
Planning Phase Awaiting Approval for Rezone |
|
Store #26, Stratham, NHThe Town of Stratham needed their Fire Protection water line extended down a section of Route 108. An easement also needed to be created for a future town water main. Methods were used as to keep Route 108 operational during the installation of the water line. Services: Designed Water Line for Fire Protection, Coordination with Town and Private Property Owners, Created Easement for Future Town Water Main (currently privately owned), Construction Inspections, Pipe Jacking Below Route 108 to Prevent Road Closure During Construction. |
Complete |
|
Store #32, Chelsea, MAThis project is a complete redevelopment of the Mystic Mall retail plaza to locate and expand the Supermarket, improve parking and traffic flow an allow for the possibility of adding residential developments in the future. Services: Site Design/Redevelopment, Demolition Procedure, Drainage System, Urban Master Planning, Permitting Through Planning Board and Zoning Board of Approvals, Construction Inspection During Demolition. |
Construction Phase. Demolition is Complete. Site and Building Construction Has Commenced |
|
Store #30, Seabrook, NHWhen a Lowes Home Improvement store was developing the parcel across the road from Market Basket, coordination was necessary for locations of driveways and signals that would be most beneficial for the client. Services: Worked Cooperatively with Abutting Development Project, Installation of New Retail, Signal, and Widening of Route 1, Modified Layout of Market Basket Site. |
|
|
Store #35, Concord, NHPeer Review and Construction Monitoring was necessary during activities involving the shared parking field of Market Basket and the Lowes Home Improvement Store currently being developed. Services: Peer Review, Construction Monitoring/Inspections |
Ongoing |
|
Store #59, Tilton, NHThis project involved the Development of a New Market Basket Site in off of Interstate 93 in Tilton, NH. The Site Development also involved signal phasing and timing adjustments, and permitting through NHDOT. Services: Structural Design, Structural Construction Inspection, Signal Phasing and Timing, Offsite Mitigation. |
Store Opened Spring 2005 |
Support Market Basket